You are currently browsing the monthly archive for September 2009.

At the end of the evening, when the ‘kiddywinks’ had gone to bed, I managed a little more work on the loading silo for ‘Overdale Quarry’.

Time for a bit more work on the loading silo. You can clearly see the two ribs on the roof for locating the upper section to
Time for a bit more work on the loading silo. You can clearly see the two ribs on the roof for locating the upper section to

The upper section has now had the top braced to keep everything square
The upper section has now had the top braced to keep everything square

The loading silo with both halves assembled. Corrugated styrene has been laminated to most of the surfaces here, except for the entrance
The loading silo with both halves assembled. Corrugated styrene has been laminated to most of the surfaces here, except for the entrance

Finally the entrance is clad in corrugated styrene as well. The next stage will see the structure rise skywards
Finally the entrance is clad in corrugated styrene as well. The next stage will see the structure rise skywards