Wiring update…

Top half of the rail load out building is removable

The top half of the rail load out building is removable, to allow for any maintenance. So, to wire up the lamp in the top floor of the rail load out building I have fitted a connector in the lower half.

Scraping the original enamelled copper wire

At this stage I have also ripped out the original plain enamelled copper wire, in favour of replacing it with coloured enamelled copper wire.

Bottom half of the load out building ready for rewiring

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s