Hatching a plan

Starting to construct a hatch frame in the upper level

Building a hatch in the highest point of ‘Dales Peak’

Whilst I’ve started work on constructing the top level of the layout, I also need to able to reach the back and corner to work on them. With this in mind I am building a framework to carry the top level baseboard panels. I want these to be removable at this stage to give me as much access as possible during construction.

You can also see that I’ve fixed the tunnel portals for the second level incline and the road below.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s