A bridge too far

Temporary bridges installed

Temporary bridges installed

I had promised myself that I would get the lower loop of track laid and working by this Christmas, but time was running out. With so many bridges to get finished this wasn’t going to happen.

So, as I finished the modelling on the plate girder road bridge, I decided that enough was enough. I would install temporary baseboard bridges so that I could get the track laying finished on the lower loop. To finish the modelling and painting on all the bridges was just going to take too long. Now, as you can see, I have all the temporary bridges in place and the track laying can be completed.

Advertisements